Skylight curb details and specifications

This page is for the person drawing the skylight, not the person buying one. It is the curb detail we actually build in New York City, the dimensions we hold, and a short form specification you can lift straight into a set. Print it and it comes out as a clean detail sheet.

We are a skylight specialist, not a roofer who also does skylights, so the curb is not an afterthought on our jobs. Everything below is our own standard, set at or above the manufacturer minimum, and it is what our crews build to on every flat roof curb in the five boroughs. If your set already has a detail, send it. We will tell you in writing what we can hold and where our standard is tighter, before anybody orders a unit. What we take on as a commercial skylight contractor is listed building by building, and the trade page covers supply only and labor only scopes.

Detail 1. Curb mounted skylight on a flat roof

The standard New York condition. Low slope roof, new framed curb, cold applied reinforced flashing, curb mounted unit. Dimensions are the ones we hold in the field.

Section through a curb mounted skylight on a low slope roof Cross section showing roof deck and framing, a framed curb 5 and one half inches above the finished roof with its top sloped 15 degrees, reinforced cold applied flashing running from the roof straight up the curb face with a 4 inch lap, and the skylight unit set on the sloped curb. Existing framing Finished roof surface Curb mounted skylight unit Curb top sloped 15 degrees min. 5 1/2 in. curb above roof 4 in. min. lap onto roof Reinforced cold applied flashing Curb screwed to deck, brackets as required Masked 4 in. out for a straight line No cant strip. Fabric runs straight off the roof and up the curb face in one pass. Curbs are not insulated.
Schematic section. Not to scale. Dimensions are New York Skylight Installers standards, held at or above manufacturer minimums.

Detail 2. Deck mounted skylight on a pitched shingle roof

On a pitched shingle roof there is no site built curb and no site invented detail. The unit sits on the deck and the manufacturer step flashing kit does the work, woven into the shingle courses.

Section through a deck mounted skylight on a pitched shingle roof Cross section on a pitched roof showing rafters and sheathing, shingle courses, the deck mounted skylight unit set on the deck and the manufacturer step flashing kit at the head, the sill and both sides. Rafters and sheathing Shingle courses Deck mounted skylight unit Manufacturer step flashing kit at head, sill and both sides Underlayment carried up to the unit No site built curb. No substitutions to the flashing kit and nothing added to it.
Schematic section. Not to scale.

The numbers, in one table

What we build to, next to what the minimum usually is. If a line matters to your detail, this is the one to copy.

ItemOur standardTypical minimum
Curb height above finished roof5 1/2 in.4 in.
Slope on curb top15 degrees minimumOften built dead flat
Curb framingStandard framing lumber, screwed to deck, brackets as requiredVaries
Curb insulationNoneVaries
Cant strip at curb baseNone, fabric runs straight up the faceCommonly specified
Curb flashingCold applied reinforced membrane, 6 in. or 12 in. reinforcing fabricVaries
Flashing laps4 in. minimumVaries
Open flameNone. No torch on any curb detailTorch applied is still common
Flashing finish lineRoof masked 4 in. out from the curb before applicationNot specified
Deck mount on shingleMatched factory step flashing kit, no substitutionsSame, when it is followed
Non VELUX unit set on a curbBedded and sealed to the top of the curb with structural siliconeVaries
Interior finish at the openingWhite wood trimVaries

Short form specification

Written so it can go into a set as is. It states performance and execution and leaves product selection open, so it does not lock your client to one brand on the units or the membrane.

1. General

Work of this section is the new or rebuilt skylight curb, the curb flashing, and the setting of the skylight unit. Installer shall be licensed in the City of New York and shall carry general liability and workers compensation. Submit product data, flashing kit data and a marked up curb section for the actual opening before fabrication.

2. Products

Curb framing: standard dimensional framing lumber. Pressure treated lumber is not required and is not used. Curb flashing: cold applied reinforced flashing membrane with compatible reinforcing fabric in 6 in. or 12 in. width. Torch applied membrane is not acceptable at the curb. Deck mounted units on a pitched roof: the unit manufacturer step flashing kit matched to the roof covering, no substitutions. Units not supplied with a flashing kit and set on a curb: structural silicone bedding at the top of the curb.

3. Execution

Build the curb to 5 1/2 in. minimum above the finished roof surface with the top of the curb sloped not less than 15 degrees to shed water away from the unit flange. Fasten the curb to the structural deck with screws, adding brackets where the framing requires it. Do not insulate the curb. Do not install a cant strip; run the reinforcing fabric from the roof surface straight up the face of the curb in one pass with laps of not less than 4 in. Mask the roof surface 4 in. out from the curb before applying flashing so the finished edge is straight. Clean the unit before setting it. Where a roof coating is part of the scope, clean the roof and patch all cracks, then apply one coat of coating; no primer coat is required by this specification.

If your office wants this as a stamped detail against a specific opening, send the roof plan and the opening dimensions and we will mark it up. That is covered under commercial ordering, and the paperwork side, including certificates of insurance and licence 2084179, is listed on the trade page. Filing questions belong with NYC permits and landmark rules.

What comes in the submittal package

Unit data

Product data and cut sheets for the exact units quoted, with the flashing kit called out as a separate line so nobody has to guess whether it is included. It is.

The curb detail

The section above, marked up for your actual opening and roof build up, rather than a generic drawing with your job name typed on it.

Compliance paper

Certificate of insurance naming the right parties, home improvement contractor licence 2084179, and the warranty language in writing.

A number and a name

A written scope and price, and one person who answers about the order after it is placed. Nobody in this market publishes that, which is exactly why we do.

Questions we get from architects and GCs

How high does a skylight curb have to be?

We build flat roof curbs 5 1/2 in. above the finished roof surface. The common minimum is 4 in. We go higher on purpose. New York roofs pond, snow drifts against anything standing up, and a curb that is only just tall enough is the first thing to let water over the top.

Does the top of the curb have to be sloped?

Ours are, at 15 degrees minimum. A flat curb top holds water against the unit flange. That is where most of the old failed skylights we pull out started going wrong.

Do you use pressure treated lumber for the curb?

No. Standard framing lumber. The curb is wrapped in cold applied flashing so it is not sitting in water, and pressure treated stock moves more and fights fasteners.

Do you insulate the curb?

No. Our curbs are not insulated.

Why no cant strip?

The reinforced fabric runs off the roof and straight up the curb face in one pass, which gives a continuous detail with nothing underneath it to shift or compress. Adding a cant adds a joint we do not need.

Is any of the flashing torch applied?

Never. Every curb detail we run is cold applied. No open flame goes on a roof we are working on.

How is the curb fastened?

Screwed to the structural deck, with brackets added where the framing calls for it.

Can you build to our detail instead of yours?

Yes. Send the set. We will tell you in writing what we can hold and what we would change before anybody orders a unit, and where our standard is tighter than the detail we will say so rather than quietly build it our way.

Can we use this page as the detail?

For pricing and coordination, yes, and that is what it is here for. For a filed set you want it marked up against the real opening, which we will do as part of the submittal.