This page is for the person drawing the skylight, not the person buying one. It is the curb detail we actually build in New York City, the dimensions we hold, and a short form specification you can lift straight into a set. Print it and it comes out as a clean detail sheet.
We are a skylight specialist, not a roofer who also does skylights, so the curb is not an afterthought on our jobs. Everything below is our own standard, set at or above the manufacturer minimum, and it is what our crews build to on every flat roof curb in the five boroughs. If your set already has a detail, send it. We will tell you in writing what we can hold and where our standard is tighter, before anybody orders a unit. What we take on as a commercial skylight contractor is listed building by building, and the trade page covers supply only and labor only scopes.
The standard New York condition. Low slope roof, new framed curb, cold applied reinforced flashing, curb mounted unit. Dimensions are the ones we hold in the field.
On a pitched shingle roof there is no site built curb and no site invented detail. The unit sits on the deck and the manufacturer step flashing kit does the work, woven into the shingle courses.
What we build to, next to what the minimum usually is. If a line matters to your detail, this is the one to copy.
| Item | Our standard | Typical minimum |
|---|---|---|
| Curb height above finished roof | 5 1/2 in. | 4 in. |
| Slope on curb top | 15 degrees minimum | Often built dead flat |
| Curb framing | Standard framing lumber, screwed to deck, brackets as required | Varies |
| Curb insulation | None | Varies |
| Cant strip at curb base | None, fabric runs straight up the face | Commonly specified |
| Curb flashing | Cold applied reinforced membrane, 6 in. or 12 in. reinforcing fabric | Varies |
| Flashing laps | 4 in. minimum | Varies |
| Open flame | None. No torch on any curb detail | Torch applied is still common |
| Flashing finish line | Roof masked 4 in. out from the curb before application | Not specified |
| Deck mount on shingle | Matched factory step flashing kit, no substitutions | Same, when it is followed |
| Non VELUX unit set on a curb | Bedded and sealed to the top of the curb with structural silicone | Varies |
| Interior finish at the opening | White wood trim | Varies |
Written so it can go into a set as is. It states performance and execution and leaves product selection open, so it does not lock your client to one brand on the units or the membrane.
Work of this section is the new or rebuilt skylight curb, the curb flashing, and the setting of the skylight unit. Installer shall be licensed in the City of New York and shall carry general liability and workers compensation. Submit product data, flashing kit data and a marked up curb section for the actual opening before fabrication.
Curb framing: standard dimensional framing lumber. Pressure treated lumber is not required and is not used. Curb flashing: cold applied reinforced flashing membrane with compatible reinforcing fabric in 6 in. or 12 in. width. Torch applied membrane is not acceptable at the curb. Deck mounted units on a pitched roof: the unit manufacturer step flashing kit matched to the roof covering, no substitutions. Units not supplied with a flashing kit and set on a curb: structural silicone bedding at the top of the curb.
Build the curb to 5 1/2 in. minimum above the finished roof surface with the top of the curb sloped not less than 15 degrees to shed water away from the unit flange. Fasten the curb to the structural deck with screws, adding brackets where the framing requires it. Do not insulate the curb. Do not install a cant strip; run the reinforcing fabric from the roof surface straight up the face of the curb in one pass with laps of not less than 4 in. Mask the roof surface 4 in. out from the curb before applying flashing so the finished edge is straight. Clean the unit before setting it. Where a roof coating is part of the scope, clean the roof and patch all cracks, then apply one coat of coating; no primer coat is required by this specification.
If your office wants this as a stamped detail against a specific opening, send the roof plan and the opening dimensions and we will mark it up. That is covered under commercial ordering, and the paperwork side, including certificates of insurance and licence 2084179, is listed on the trade page. Filing questions belong with NYC permits and landmark rules.
Product data and cut sheets for the exact units quoted, with the flashing kit called out as a separate line so nobody has to guess whether it is included. It is.
The section above, marked up for your actual opening and roof build up, rather than a generic drawing with your job name typed on it.
Certificate of insurance naming the right parties, home improvement contractor licence 2084179, and the warranty language in writing.
A written scope and price, and one person who answers about the order after it is placed. Nobody in this market publishes that, which is exactly why we do.
We build flat roof curbs 5 1/2 in. above the finished roof surface. The common minimum is 4 in. We go higher on purpose. New York roofs pond, snow drifts against anything standing up, and a curb that is only just tall enough is the first thing to let water over the top.
Ours are, at 15 degrees minimum. A flat curb top holds water against the unit flange. That is where most of the old failed skylights we pull out started going wrong.
No. Standard framing lumber. The curb is wrapped in cold applied flashing so it is not sitting in water, and pressure treated stock moves more and fights fasteners.
No. Our curbs are not insulated.
The reinforced fabric runs off the roof and straight up the curb face in one pass, which gives a continuous detail with nothing underneath it to shift or compress. Adding a cant adds a joint we do not need.
Never. Every curb detail we run is cold applied. No open flame goes on a roof we are working on.
Screwed to the structural deck, with brackets added where the framing calls for it.
Yes. Send the set. We will tell you in writing what we can hold and what we would change before anybody orders a unit, and where our standard is tighter than the detail we will say so rather than quietly build it our way.
For pricing and coordination, yes, and that is what it is here for. For a filed set you want it marked up against the real opening, which we will do as part of the submittal.